Planning Your Deployment Scope
Plan your Verdigris deployment scope: hardware compatibility, what an installation looks like, use case examples, choosing hardware and shadow metering.
5 articles
- What are the Hardware Compatibility Requirements?Use this guide to check whether Verdigris hardware is compatible with your electrical panel configuration, from the hardware compatibility requirements.
- What Does an Installation Look Like?Verdigris can be installed on everything from main distribution boards to motor control centers to downstream distribution panels
- Deployment and Use Case ExamplesExamples of how other customers scoped their Verdigris deployments, including a sample electrical line drawing and a guide for choosing panels to meter.
- How Do I Determine What Hardware to Purchase?Use this document to scope what parts and accessories you will need to properly configure your Verdigris system.
- Do I need shadow metering configuration?Our standard recommendation is to add an additional 3 CTs to full panel metering to provide reassurance that data is flowing accurately.
